- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (a wnaed Fel)
Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). Dim ond ar ei ffurf wreiddiol y mae’r eitem hon o ddeddfwriaeth ar gael ar hyn o bryd.
Article 2
The works referred to in this Order and shown on the deposited plan are:–
Works No. 1 | An intake structure incorporating an arrangement of weirs to limit abstraction from the river such that a supply is taken only when the stream flow exceeds the specified residual flow rate and to ensure that the maximum rate of abstraction is not exceeded. It also includes an approved gauge to measure and record the compensation water taken from the river. |
Works No. 2 | A raw water main from the intake on Abhainn a' Mhinisteir to the new Treatment Works. |
Works No. 3 | A Treatment Works containing an approved gauge and instrumentation to measure and record the amount of water taken from the intake. |
Works No. 4 | A bankside storage reservoir for raw water. |
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys: