- Latest available (Revised)
- Original (As enacted)
Town and Country Planning Act 1990, Section 153 is up to date with all changes known to be in force on or before 26 November 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations.
Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.
Whole provisions yet to be inserted into this Act (including any effects on those provisions):
(1)Where a counter-notice has been served under section 151 objecting to a blight notice, the claimant may require the objection to be referred to the [F1Upper Tribunal].
F2(2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(3)On any such reference, if the objection is not withdrawn, the [F1Upper Tribunal] shall consider—
(a)the matters set out in the notice served by the claimant, and
(b)the grounds of the objection specified in the counter-notice;
and, subject to subsection (4), unless it is shown to the satisfaction of the Tribunal that the objection is not well-founded, the Tribunal shall uphold the objection.
(4)An objection on the grounds mentioned in section 151(4)(b), (c) or (d) shall not be upheld by the Tribunal unless it is shown to the satisfaction of the Tribunal that the objection is well-founded.
[F3(4A)Where the effect of a blight notice would be a compulsory purchase to which Part 1 of the Compulsory Purchase Act 1965 applies, the Upper Tribunal may uphold an objection on the grounds mentioned in section 151(4)(c) only if it is satisfied that the part of the hereditament or affected area proposed to be acquired in the counter-notice—
(a)in the case of a house, building or factory, can be taken without material detriment to the house, building or factory, or
(b)in the case of a park or garden belonging to a house, can be taken without seriously affecting the amenity or convenience of the house.]
(5)If the Tribunal determines not to uphold the objection, the Tribunal shall declare that the notice to which the counter-notice relates is a valid notice.
(6)If the Tribunal upholds the objection, but only on the grounds mentioned in section 151(4)(c), the Tribunal shall declare that the notice is a valid notice in relation to the part of the hereditament, or in the case of an agricultural unit the part of the affected area, specified in the counter-notice as being the part which the appropriate authority propose to acquire as mentioned in that notice, but not in relation to any other part of the hereditament or affected area.
(7)In a case falling within subsection (5) or (6), the Tribunal shall give directions specifying the date on which notice to treat (as mentioned in section 154) is to be deemed to have been served.
(8)This section shall have effect in relation to a further counter-notice served by virtue of section 152(1) as it has effect in relation to the counter-notice for which it is substituted.
Textual Amendments
F1Words in s. 153 heading substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 5(1)(2), Sch. 1 para. 198(a)
F2Words in s. 153(2) omitted (1.6.2009) by virtue of The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 5(1)(2), Sch. 1 para. 198(b)
F3S. 153(4A) inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), ss. 200(2), 216(3); S.I. 2017/75, reg. 3(h)
Modifications etc. (not altering text)
C1S. 153(4A) excluded by 2017 c. 7, s. 8(2) (as amended (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 3; S.I. 2017/209, reg. 2)
C2S. 153(4A) excluded by 2017 c. 7, s. 7(2) (as amended (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 2; S.I. 2017/209, reg. 2)
C3S. 153(4A) excluded (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 22(3) (with arts. 22(4), 32(2))
C4S. 153(4A) excluded (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 29(3)(c) (with arts. 4, 29(4), 37)
C5S. 153(4A) excluded (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 30(3)(c) (with arts. 30(4), 58, 59)
C6S. 153(4A) excluded (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 21(4), 22(3) (with arts. 22(4), 24(8), 33(2))
C7S. 153(4A) excluded (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 27(4)(c) (with art. 27(5))
C8S. 153(4A) excluded (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 22(3)(c) (with arts. 22(4), 31(2))
C9S. 153(4A) excluded (3.10.2018) by The A19/A184 Testos Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 27 (with arts. 3(3), 5)
C10S. 153(4A) excluded (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 26(3)(c)(4) (with arts. 55, 56)
C11S. 153(4A) excluded (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 24(3)(c) (with art. 24(4))
C12S. 153(4A) excluded (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 25(3)(c) (with art. 25(4))
C13S. 153(4A) excluded (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 25(3)(c) (with art. 25(4))
C14S. 153(4A) excluded (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 31(3)(c) (with arts. 3(1), 31(4))
C15S. 153(4A) excluded (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 23(3)(c) (with arts. 7, 23(4))
C16S. 153(4A) excluded (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 27(3)(c) (with arts. 5, 27(4), 44)
C17S. 153(4A) excluded (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 25(3)(c) (with arts. 7, 25(4))
C18S. 153(4A) excluded (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 27(4)(c) (with arts. 51, 57)
C19S. 153(4A) excluded (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 31(3)(c) (with arts. 31(4), 37)
C20S. 153(4A) excluded (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 27(3)(c) (with arts. 5, 27(4), 44)
C21S. 153(4A) excluded (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 21(3)(c) (with arts. 21(4), 37)
C22S. 153(4A) excluded (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 27(3)(c) (with arts. 5, 27(4))
C23S. 153(4A) excluded (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 24(3)(c) (with art. 24(4), Sch. 9 para. 144)
C24S. 153(4A) excluded (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 33(4)(c) (with art. 33(5))
C25S. 153(4A) excluded (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 28(3)(c) (with arts. 28(4), 32, Sch. 9 para. 36)
C26S. 153(4A) excluded (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 23(3) (with arts. 23(4), 40, 41, Sch. 9 Pt. 5 para. 18)
C27S. 153(4A) excluded (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 30(3)(c) (with arts. 5, 30(4), Sch. 27 para. 36)
C28S. 153(4A) excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 7(2)(c), 64(1) (with s. 7(3))
C29S. 153(4A) excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 6(2)(c), 64(1)
C30S. 153(4A) excluded (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 31(3)(c) (with arts. 4, 31(4), 47)
C31S. 153(4A) excluded (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 26(3)(c) (with arts. 15, 50, Sch. 11 para. 29)
C32S. 153(4A) excluded (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 24(3)(c) (with arts. 41, 42, Sch. 17 para. 66)
C33S. 153(4A) excluded (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 24(3)(c) (with arts. 24(4), 41, 42, Sch. 16)
C34S. 153(4A) excluded (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 25(4)(c) (with Sch. 8 Pt. 6 para. 19)
C35S. 153(4A) excluded (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 35 (with art. 55)
C36S. 153(4A) excluded (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 24(3)(c) (with arts. 40, 41)
C37S. 153(4A) excluded (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 24(3)(c) (with arts. 24(4), 40, 41)
C38S. 153(4A) excluded (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 27(3)(c) (with art. 27(4))
C39S. 153(4A) excluded (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 30(3)(c) (with arts. 6, 30(4), 34)
C40S. 153(4A) excluded (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 32(3)(c) (with arts. 5, 32(4), 36)
C41S. 153(4A) excluded (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 32(3)(c) (with arts. 4, 32(4), 50)
C42S. 153(4A) excluded (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 35 (with arts. 35(4), 62, 76, 87)
C43S. 153(4A) excluded (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 31(3)(c) (with arts. 4, 31(4), 53)
C44S. 153(4A) excluded (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 32(4)(c) (with art. 32(5))
C45S. 153(4A) excluded (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 30(3)(c) (with art. 30(6))
C46S. 153(4A) excluded (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 31(4)(c) (with art. 31(5))
C47S. 153(4A) excluded (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 32(3)(c) (with arts. 4, 52, Sch. 9 para. 82)
C48S. 153(4A) excluded (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 35(3)(c)
C49S. 153(4A) excluded (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 31(3)(c) (with arts. 31(4), 51)
C50S. 153(4A) excluded (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 29(3)(c) (with arts. 5, 29(4))
C51S. 153(4A) excluded (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 32(3) (with arts. 4, 32(4))
C52S. 153(4A) excluded (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 24(3)(c) (with arts. 24(4), 32, Sch. 10 paras. 26(2), 68)
C53S. 153(4A) excluded (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 32(3) (with arts. 4, 50)
C54S. 153(4A) excluded (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 23(3) (with art. 23(4))
C55S. 153(4A) excluded (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 32(3)(c) (with arts. 5, 32(4), 53, Sch. 8 paras. 6, 64)
C56S. 153(4A) excluded (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 25(3) (with arts. 25(4), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)
C57S. 153(4A) excluded (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 27(4) (with arts. 6(2), 18, 27(5), Sch. 11 paras. 5, 30)
C58S. 153(4A) excluded (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 31(3) (with arts. 4, 31(4), 45, Sch. 9 paras. 6, 46, 54(1))
C59S. 153(4A) excluded (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 24 (with arts. 36, 37, Sch. 9 paras. 14, 44(1), 76, 103)
C60S. 153(4A) excluded (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 22(3) (with arts. 22(4), 43, Sch. 12 paras. 5, 24)
C61S. 153(4A) excluded (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 38(3) (with arts. 4, 38(4), 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)
C62S. 153(4A) excluded (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 28(3) (with arts. 28(4), 42, 43, Sch. 12 paras. 5, 51, 91, 129, 136, 234, 345, 356)
C63S. 153(4A) excluded (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 26(3) (with art. 26(4), Sch. 11 paras. 5, 22, 37, 47, 82, 110)
C64S. 153(4A) excluded (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 27(3) (with arts. 18, 27(4), 35, Sch. 9)
C65S. 153(4A) excluded (5.4.2024) by virtue of The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 34(3) (with art. 44, Sch. 15)
C66S. 153(4A) excluded (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 31(4) (with arts. 21, 41, Sch. 10)
C67S. 153(4A) excluded (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 22(4) (with arts. 22(5), 35, 36, Sch. 14)
C68S. 153(4A) excluded (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 34(3) (with art. 6, Sch. 10)
C69S. 153(4A) excluded (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 22(3) (with arts. 22(4), 44, Sch. 12)
C70S. 153(4A) excluded (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 23(3) (with arts. 23(4), 45, Sch. 14)
C71S. 153(4A) excluded (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 25(3) (with art. 25(4), Sch. 15)
C72S. 153(4A) excluded (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 25(3) (with arts. 25(4), 48, Sch. 15)
C73S. 153(4A) excluded (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), arts. 1, 24(3) (with art. 40, Sch. 14)
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: