- Latest available (Revised)
- Point in Time (03/08/2023)
- Original (As enacted)
Version Superseded: 04/08/2023
Point in time view as at 03/08/2023.
Compulsory Purchase (Vesting Declarations) Act 1981 is up to date with all changes known to be in force on or before 27 December 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations.
Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.
Section 12
Textual Amendments
F1Sch. A1 inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 6; S.I. 2017/75, reg. 3(k) (with reg. 5)
Modifications etc. (not altering text)
C1Sch. A1 excluded by 2017 c. 7, s. 7(2) (as amended) (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 2; S.I. 2017/209, reg. 2
C2Sch. A1 excluded by 2017 c. 7, s. 8(2) (as amended) (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 3; S.I. 2017/209, reg. 2
C3Sch. A1 excluded (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 22(3) (with arts. 22(4), 32(2))
C4Sch. A1 excluded (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 29(3)(b) (with arts. 4, 29(4), 37)
C5Sch. A1 excluded (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 30(3)(b) (with arts. 30(4), 58, 59)
C6Sch. A1 excluded (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 21(4)(b) (with arts. 24(8), 33(2))
C7Sch. A1 excluded (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 27(4)(b) (with art. 27(5))
C8Sch. A1 excluded (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 22(3)(b) (with arts. 22(4), 31(2))
C9Sch. A1 excluded (3.10.2018) by The A19/A184 Testos Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 27 (with arts. 3(3), 5)
C10Sch. A1 excluded (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 26(3)(b)(4) (with arts. 55, 56)
C11Sch. A1 excluded (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 24(3)(b) (with art. 24(4))
C12Sch. A1 excluded (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 25(3)(b) (with art. 25(4))
C13Sch. A1 excluded (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 25(3)(b) (with art. 25(4))
C14Sch. A1 excluded (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1(1), 31(3)(b) (with arts. 3(1), 31(4))
C15Sch. A1 excluded (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 23(3)(b) (with arts. 7, 23(4))
C16Sch. A1 excluded (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 27(3)(b) (with arts. 5, 27(4), 44)
C17Sch. A1 excluded (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 25(3)(b) (with arts. 7, 25(4))
C18Sch. A1 excluded (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 27(4)(b) (with arts. 51, 57)
C19Sch. A1 excluded (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 31(3)(b) (with arts. 31(4), 37)
C20Sch. A1 excluded (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 27(3)(b) (with arts. 5, 27(4), 44)
C21Sch. A1 excluded (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 21(3)(b) (with arts. 21(4), 37)
C22Sch. A1 excluded (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 27(3)(b) (with arts. 5, 27(4))
C23Sch. A1 excluded (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 24(3)(b) (with art. 24(4), Sch. 9 para. 144)
C24Sch. A1 excluded (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 33(4)(b) (with art. 33(5))
C25Sch. A1 excluded (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 28(3)(b) (with arts. 28(4), 32, Sch. 9 para. 36)
C26Sch. A1 excluded (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 23(3) (with arts. 23(4), 40, 41, Sch. 9 Pt. 5 para. 18)
C27Sch. A1 excluded (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 30(3)(b) (with arts. 5, 30(4), Sch. 27 para. 36)
C28Sch. A1 excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 7(2)(b), 64(1) (with s. 7(3))
C29Sch. A1 excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 6(2)(b), 64(1)
C30Sch. A1 excluded (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 31(3)(b) (with arts. 4, 31(4), 47)
C31Sch. A1 excluded (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 26(3)(b) (with arts. 15, 50, Sch. 11 para. 29)
C32Sch. A1 excluded (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 24(3)(b) (with arts. 41, 42, Sch. 17 para. 66)
C33Sch. A1 excluded (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 24(3)(b) (with arts. 24(4), 41, 42, Sch. 16)
C34Sch. A1 excluded (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 25(b) (with Sch. 8 Pt. 6 para. 19)
C35Sch. A1 excluded (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 35 (with art. 55)
C36Sch. A1 excluded (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 24(3)(b) (with arts. 40, 41)
C37Sch. A1 excluded (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 24(3)(b) (with arts. 24(4), 40, 41)
C38Sch. A1 excluded (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 27(3)(b) (with art. 27(4))
C39Sch. A1 excluded (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 30(3)(b) (with arts. 6, 30(4), 34)
C40Sch. A1 excluded (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 32(3)(b) (with arts. 5, 32(4), 36)
C41Sch. A1 excluded (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 32(3)(b) (with arts. 4, 32(4), 50)
C42Sch. A1 excluded (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 35 (with arts. 35(4), 62, 76, 87)
C43Sch. A1 excluded (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 31(3)(b) (with arts. 4, 31(4), 53)
C44Sch. A1 excluded (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 35(3)(b)
C45Sch. A1 excluded (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 30-32 (with art. 46(2), Sch. 19 para. 61)
C46Sch. A1 excluded (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 32(3) (with arts. 4, 52, Sch. 9 para. 82)
C47Sch. A1 excluded (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 31(3)(b) (with arts. 31(4), 51)
C48Sch. A1 excluded (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 29(3)(b) (with arts. 5, 29(4))
C49Sch. A1 excluded (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 32(3) (with arts. 4, 32(4))
C50Sch. A1 excluded (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 32(3) (with arts. 4, 50)
C51Sch. A1 excluded (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 24(3)(b) (with arts. 24(4), 32, Sch. 10 paras. 26(2), 68)
C52Sch. A1 excluded (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 23(3) (with art. 23(4))
C53Sch. A1 excluded (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 32(3)(b) (with arts. 5, 32(4), 53, Sch. 8 paras. 6, 64)
C54Sch. A1 excluded (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 25(3) (with arts. 25(4), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)
1(1)This Schedule applies where an acquiring authority have executed a general vesting declaration in respect of part only of a house, building or factory.E+W
(2)But see section 2A of the Acquisition of Land Act 1981 (under which a compulsory purchase order can exclude from this Schedule land that is 9 metres or more below the surface).
2E+WA person able to sell the whole of the house, building or factory (“the owner”) may serve a counter-notice requiring the authority to purchase the owner's interest in the whole.
3E+WA counter-notice under paragraph 2 must be served before the end of the period of 28 days beginning with the day the owner first had knowledge of the general vesting declaration.
4E+WIn a case where this Schedule applies by virtue of a general vesting declaration executed after a counter-notice has been served under paragraph 4 or 17 of Schedule 2A to the Compulsory Purchase Act 1965, that counter-notice is to have effect as a counter-notice served under this Schedule.
5E+WIn this Schedule—
“additional land” means the part of the house, building or factory not specified in the general vesting declaration;
“house” includes any park or garden belonging to a house;
“land proposed to be acquired” means the part of the house, building or factory specified in the general vesting declaration;
“notice to treat” means a notice to treat deemed to have been served under section 7(1);
“original vesting date” is the first day after the end of the period specified in the general vesting declaration in accordance with section 4(1).
6(1)On receiving a counter-notice the acquiring authority must decide whether to—E+W
(a)withdraw the notice to treat in relation to the land proposed to be acquired,
(b)accept the counter-notice, or
(c)refer the counter-notice to the Upper Tribunal.
(2)But the acquiring authority may not decide to withdraw the notice to treat if the counter-notice was served on or after the original vesting date.
7E+WThe authority must serve notice of their decision on the owner within the period of 3 months beginning with the day on which the counter-notice is served (“the decision period”).
8E+WIf the authority decide to refer the counter-notice to the Upper Tribunal they must do so within the decision period.
9(1)This paragraph applies if the acquiring authority do not serve notice of a decision within the decision period.E+W
(2)If the counter-notice was served before the original vesting date, the authority are to be treated as if they had served notice of a decision to withdraw the notice to treat in relation to the land proposed to be acquired.
(3)If the counter-notice was served on or after the original vesting date, they are to be treated as if they had served notice of a decision to accept it.
10E+WIf the acquiring authority serve notice of a decision to withdraw the notice to treat in relation to the land proposed to be acquired the general vesting declaration is to have effect as if it did not include that land.
11(1)This paragraph applies where the acquiring authority serve notice of a decision to accept the counter-notice.E+W
(2)The general vesting declaration and the notice to treat (and, where applicable, the compulsory purchase order) are to have effect as if they included the owner's interest in the additional land as well as in the land proposed to be acquired.
(3)The authority must serve on the owner a notice specifying the vesting date or dates for—
(a)the land proposed to be acquired (if the counter-notice was served before the original vesting date), and
(b)the additional land.
(4)The new vesting date for the land proposed to be acquired must not be before the original vesting date.
(5)The vesting date for the additional land must be after the period of 3 months beginning with the day on which the notice under sub-paragraph (3) is served.
12(1)This paragraph applies where—E+W
(a)the acquiring authority refer the counter-notice to the Upper Tribunal, and
(b)the counter-notice was served before the original vesting date.
(2)At any time before the Upper Tribunal make a determination under paragraph 14, the acquiring authority may serve notice on the owner specifying a new vesting date for the land proposed to be acquired.
(3)The new vesting date for the land proposed to be acquired must not be before the original vesting date.
13E+WThis Part applies where, in accordance with paragraph 8, the acquiring authority refer a counter-notice to the Upper Tribunal.
14(1)The Upper Tribunal must determine whether the severance of the land proposed to be acquired would—E+W
(a)in the case of a house, building or factory, cause material detriment to the house, building or factory, or
(b)in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs.
(2)In making its determination, the Upper Tribunal must take into account—
(a)the effect of the severance,
(b)the proposed use of the land proposed to be acquired, and
(c)if that land is proposed to be acquired for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land.
15E+WIf the Upper Tribunal determines that the severance of the land proposed to be acquired would have either of the consequences described in paragraph 14(1) it must determine how much of the additional land the acquiring authority ought to be required to take in addition to the land proposed to be acquired.
16(1)This paragraph applies where the Upper Tribunal specifies in its determination that the acquiring authority ought to be required to take the whole or part of the additional land (“the specified land”).E+W
(2)The general vesting declaration and any notice to treat (and, where applicable, the compulsory purchase order) are to have effect as if they included the owner's interest in the specified land.
(3)The Upper Tribunal must order a vesting date for—
(a)the specified land, and
(b)any land proposed to be acquired which has not vested in the authority and for which no vesting date has been specified under paragraph 12.
[F2(4)If the vesting date for the specified land is after the vesting date for any land proposed to be acquired, the Upper Tribunal's power to award compensation under section 7 of the Compulsory Purchase Act 1965 includes power to award compensation for any loss suffered by the owner by reason of the temporary severance of the land proposed to be acquired from the specified land.]
Textual Amendments
F2Sch. A1 para. 16(4) inserted (19.7.2017) by Neighbourhood Planning Act 2017 (c. 20), ss. 41, 46(1); S.I. 2017/767, reg. 2(j)
17(1)This paragraph applies where—E+W
(a)the Upper Tribunal has specified in its determination that the acquiring authority ought to be required to take the whole or part of the additional land (“the specified land”), and
(b)the vesting date in relation to the land proposed to be acquired has not passed, and
(c)the vesting date in relation to the specified land has not passed.
(2)The acquiring authority may, within the period of 6 weeks beginning with the day on which the Upper Tribunal made its determination, withdraw the notice to treat in relation to the land proposed to be acquired together with the specified land.
(3)If the acquiring authority withdraws the notice to treat, the general vesting declaration is to have effect as if it did not include that land.
(4)If the acquiring authority withdraws the notice to treat under this paragraph they must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawal of the notice.
(5)Any dispute as to the compensation is to be determined by the Upper Tribunal.]
Section 8.
Modifications etc. (not altering text)
C55Sch. 1 excluded (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 6 para. 11(3)(b)
C56Sch. 1 excluded (23.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), ss. 7(2), 8(2), 70(1) (with s. 8(3))
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F3Sch. 1 Pt. I omitted (3.2.2017) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 7; S.I. 2017/75, reg. 3(k) (with reg. 5)
11(1)Where land specified in a general vesting declaration is, together with other land not so specified, charged with a rentcharge, such proportion of the rentcharge as may be apportioned under section 18 of the M1Compulsory Purchase Act 1965 to the first-mentioned land shall, subject to sub-paragraph (3) below, be treated as having been extinguished by virtue of Part III of this Act on the vesting of that land in an acquiring authority under that Part.E+W
(2)Where by virtue of sub-paragraph (1) above a portion of the rentcharge is treated as having been extinguished, the provisions of section 18 of the M2Compulsory Purchase Act 1965 shall have effect as if the extinguishment had taken place under that section.
(3)If, in the circumstances described in sub-paragraph (1) above, the person entitled to the rent charge and the owner of the land subject thereto enter into an agreement to that effect, the said section 18 shall have effect as if, at the time of the vesting of the land in the acquiring authority under Part III of this Act, the person entitled to the rentcharge had released that land from the rentcharge on the condition mentioned in subsection (2) of that section; and in that case no part of the rentcharge shall be treated as having been extinguished as regards the remaining part of the land charged therewith.
(4)In this paragraph “rentcharge” has the same meaning as in section 18 of the M3Compulsory Purchase Act 1965.
12E+WWhere land specified in a general vesting declaration is, together with other land not so specified, comprised in a tenancy for a term of years unexpired, section 19 of the M4Compulsory Purchase Act 1965 shall have effect in relation thereto as if for references to the time of the apportionment of rent therein mentioned there were substituted references to the time of vesting of the tenancy in the acquiring authority.
Marginal Citations
Section 15.
1E+WIn relation to an order (“the order”) under section 141 of the M5Local Government, Planning and Land Act 1980 (subsection (4) of which provides that an order under that section shall have the same effect as a general vesting declaration) this Act shall have effect subject to the modifications in this Schedule.
Modifications etc. (not altering text)
C57Sch. 2 para. 1 modified: by Housing Act 1988 (c. 50, SIF 61), s. 76(5), Sch. 9 Pt. II para. 12(1); (10.11.1993) by 1993 c. 28, s. 161(4), Sch. 19 para. 7(1); S.I. 1993/2762, art. 3; which modification was repealed (1.12.2008) by Housing and Regeneration Act 2008 (c. 17), s. 325(1), Sch. 8 para. 33(3)(a), Sch. 16; S.I. 2008/3068, arts. 2(1)(w)(3), 5, Sch. (with arts. 6-13)
Marginal Citations
2(1)Any reference in Part III or IV to a general vesting declaration shall be treated as a reference to the order.E+W
(2)Any reference in Part III or IV to the vesting date shall be treated as a reference to the date on which the order comes into force, and the reference in section 11(1) to the execution of a general vesting declaration shall be treated as a reference to the order having come into force.
3E+WIn section 7(1)—
(a)the reference to every person on whom, under section 5 of the Compulsory Purchase Act 1965, the acquiring authority could have served a notice to treat shall be treated as a reference to every person whose interest in the land to which the order relates is vested by the order in the Urban Development Corporation,
(b)paragraph (i) shall be omitted.
Modifications etc. (not altering text)
C58Sch. 2 para. 3 modified by Housing Act 1988 (c. 50, SIF 61), s. 76(5), Sch. 9 Pt. II para. 12(2)
C59Sch. 2 para. 3(a) modified (10.11.1993) by 1993 c. 28, s. 161(4), Sch. 19 para. 7(2); S.I. 1993/2762, art. 3; which modification was amended (1.12.2008) by 2008 c. 17, s. 325(1), Sch. 8 para. 33(2); S.I. 2008/3068, arts. 2(1)(w)(3) (with arts. 6-13)
[F44E+WIn Schedule A1, for paragraph 3 there is to be substituted—
“3A counter-notice under paragraph 2 must be served within the period of 28 days beginning with the day on which the order comes into force.”]
Textual Amendments
F4Sch. 2 para. 4 substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 8; S.I. 2017/75, reg. 3(k) (with reg. 5)
Section 16(1).
1E+WIn the Land Compensation Act 1973, in sections 50(4), 53(5) and 57(1) for “Schedule 3 to the Town and Country Planning Act 1968” substitute “Part III of the Compulsory Purchase (Vesting Declarations) Act 1981”.
Modifications etc. (not altering text)
C60The text of s. 16(1)(3), Sch. 3 paras. 1, 3, 4 and Sch. 5 is in the form in which it was originally enacted: it was not reproduced in Statutes in Force and does not reflect any amendments or repeals which may have been made prior to 1.2.1991
2E+W. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F5
Textual Amendments
F5Sch. 3 para. 2 repealed by Capital Transfer Tax Act 1984 (c. 51, SIF 65), Sch. 9
3E+WIn section 45(5)(a) of the Development Land Tax Act 1976 for “Schedule 3 to the Town and Country Planning Act 1968” substitute “the Compulsory Purchase (Vesting Declarations) Act 1981”.
Modifications etc. (not altering text)
C61The text of s. 16(1)(3), Sch. 3 paras. 1, 3, 4 and Sch. 5 is in the form in which it was originally enacted: it was not reproduced in Statutes in Force and does not reflect any amendments or repeals which may have been made prior to 1.2.1991
4E+WIn section 141(4) of the Local Government, Planning and Land Act 1980 for “section 30 of the Town and Country Planning Act 1968” substitute “the Compulsory Purchase (Vesting Declarations) Act 1981”.
Modifications etc. (not altering text)
C62The text of s. 16(1)(3), Sch. 3 paras. 1, 3, 4 and Sch. 5 is in the form in which it was originally enacted: it was not reproduced in Statutes in Force and does not reflect any amendments or repeals which may have been made prior to 1.2.1991
Section 16(2).
1(1)This paragraph is without prejudice to section 17(2)(a) of the M6Interpretation Act 1978 as extended to the interpretation of subordinate legislation and instruments and documents by section 23(2) and (3) of that Act.E+W
(2)Any document made, served or issued before the passing of this Act or at any time thereafter (whether before or after the commencement of this Act) and containing a reference to an enactment repealed by this Act shall, except in so far as a contrary intention appears, be construed as referring, or as the context requires, as including a reference, to the corresponding provision of this Act.
Marginal Citations
2E+WAny reference, whether express or implied, in any enactment, instrument or document (including this Act and any enactment amended by Schedule 3 to this Act) to, or to things done or falling to be done under or for the purposes of, any provision of this Act shall, if and so far as the nature of the reference permits, be construed as including, in relation to the circumstances or purposes in relation to which the corresponding provision in the enactments repealed by this Act has or had effect, a reference to, as the case may be to things done or falling to be done under or for the purpose of, that corresponding provision.
3E+WWhere a period of time specified in any enactment repealed by this Act is current at the commencement of this Act, this Act has effect as if the corresponding provision of this Act had been in force when that period began to run.
4(1)Any reference in this Act (whether express or implied) to a thing done by a Minister, or by a local authority, under a provision of this Act includes, except where the context otherwise requires, a reference to the corresponding thing done by a predecessor authority under the corresponding enactment repealed by this Act.E+W
(2)In this paragraph “predecessor authority” means—
(a)where the relevant function has been transferred from one Minister to another, the Minister from whom the function was transferred.
(b)where the relevant function has been transferred from one local authority to another, under any enactment (including in particular the M7London Government Act 1963, the M8Local Government Act 1972 and the M9Water Act 1973), the authority from whom the function was transferred.
5E+WThis Act shall not apply to the compulsory acquisition of land with respect to which a compulsory purchase order was in force before 1st April 1969.
Sectiion 16(3).
Modifications etc. (not altering text)
C63The text of s. 16(1)(3), Sch. 3 paras. 1, 3, 4 and Sch. 5 is in the form in which it was originally enacted: it was not reproduced in Statutes in Force and does not reflect any amendments or repeals which may have been made prior to 1.2.1991
Chapter | Short title | Extent of repeal |
---|---|---|
1968 c. 72. | Town and Country Planning Act 1968. | Section 30. |
In section 104, in subsection (1) the definitions of “Act of 1946”, “prescribed” and “the principal Act”, and subsection (3). | ||
Schedule 3. | ||
Schedule 3A. | ||
In Schedule 10 paragraph 14. | ||
1971 c. 18. | Land Commission (Dissolution) Act 1971. | In Schedule 2 paragraph 2 and Appendix A. |
1973 c. 26. | Land Compensation Act 1973. | In section 58(1) the words “paragraph 10 of Schedule 3A to the Town and Country Planning Act 1968”. |
1980 c. 65. | Local Government, Planning and Land Act 1980. | In Schedule 27 paragraphs 1 to 8. |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: