- Latest available (Revised)
- Point in Time (27/09/2024)
- Original (As enacted)
Version Superseded: 04/10/2024
Point in time view as at 27/09/2024. This version of this provision has been superseded.
You are viewing this legislation item as it stood at a particular point in time. A later version of this or provision, including subsequent changes and effects, supersedes this version.
Note the term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section.
There are outstanding changes not yet made by the legislation.gov.uk editorial team to Water Industry Act 1991. Any changes that have already been made by the team appear in the content and are referenced with annotations.
Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.
[F1(1)Subject to the provisions of this section—
(a)the owner or occupier of any premises, or
(b)the owner of any private sewer which drains premises,
shall be entitled to have his drains or sewer communicate with the public sewer of any sewerage undertaker and thereby to discharge foul water and surface water from those premises or that private sewer.]
[F2(1A)In this section, and in sections 107 to 109, 111, 113 to 116, 118, 119, 124, 127, 139 and 146 below—
(a)references (however expressed) to a public sewer include a public lateral drain which satisfies sewer standards; and
(b)for the purposes of paragraph (a) above—
(i)a “public lateral drain” is a lateral drain which either belongs to the sewerage undertaker or is vested in the sewerage undertaker by virtue of a declaration made under section 102 above or under an agreement made under section 104 above; and
(ii)“sewer standards” means such standards of construction and repair as the undertaker would require if the public lateral drain or part of it were to become a public sewer.]
[F3(1B)The right under subsection (1) is subject to section 106A.]
(2)Subject to the provisions of Chapter III of this Part, nothing in subsection (1) above shall entitle any person—
(a)to discharge directly or indirectly into any public sewer—
(i)any liquid from a factory, other than domestic sewage or surface or storm water, or any liquid from a manufacturing process; or
(ii)any liquid or other matter the discharge of which into public sewers is prohibited by or under any enactment; or
(b)where separate public sewers are provided for foul water and for surface water, to discharge directly or indirectly—
(i)foul water into a sewer provided for surface water; or
(ii)except with the approval of the undertaker, surface water into a sewer provided for foul water; or
(c)to have his drains or sewer made to communicate directly with a storm-water overflow sewer.
(3)A person desirous of availing himself of his entitlement under this section shall give notice of his proposals to the sewerage undertaker in question.
(4)At any time within twenty-one days after a sewerage undertaker receives a notice under subsection (3) above, the undertaker may by notice to the person who gave the notice refuse to permit the communication to be made, if it appears to the undertaker that the mode of construction or condition of the drain or sewer
[F4(a)does not satisfy the standards reasonably required by the undertaker; or
(b)is such that the making of the communication would be prejudicial to the undertaker’s sewerage system.]
(5)For the purpose of examining the mode of construction and condition of a drain or sewer to which a notice under subsection (3) above relates a sewerage undertaker may, if necessary, require it to be laid open for inspection.
[F5(5A)Where the sewer or drain satisfies the standards reasonably required by it, a sewerage undertaker may, as a condition of permitting the communication to be made, require that the sewer or that part of the drain forming the lateral drain be vested in it by virtue of a declaration under section 102 above.]
(6)Any question arising under subsections [F6(3) to (5A)] above between a sewerage undertaker and a person proposing to make a communication as to—
(a)the reasonableness of the undertaker’s refusal to permit a communication to be made; or
(b)as to the reasonableness of any requirement under subsection (5) [F7or (5A)] above,
may, on the application of that person, be determined by [F8[F9the Authority] under section 30A above] [F10(and, accordingly, section 105 above shall not apply to any requirement under subsection (5A) above).]
F11(7). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(8)Where a person proposes under this section to make a communication between a drain or sewer and such a public sewer in Greater London as is used for the general reception of sewage from other public sewers and is not substantially used for the reception of sewage from private sewers and drains—
(a)the grounds on which a sewerage undertaker may refuse to permit the communication shall be such grounds as the undertaker thinks fit; and
(b)no application to [F9the Authority] may be made under subsection (6) above in respect of any refusal under this subsection.
(9)In this section “factory” has the same meaning as in the M1Factories Act 1961.
Textual Amendments
F1S. 106(1) substituted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 43(2); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt. I
F2S. 106(1A) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 99(2), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F3S. 106(1B) inserted (2.5.2018 for W. for specified purposes, 7.1.2019 for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 3 para. 16(1) (with s. 49(1)(6)); S.I. 2018/557, arts. 2(b), 3(b)
F4S. 106(4): paras. (a)(b) substituted (28.5.2004) for words by Water Act 2003 (c. 37), ss. 99(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F5S. 106(5A) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 99(4), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F6Words in s. 106(6) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 99(5)(a), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F7Words in s. 106(6)(b) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 99(5)(b), 105(3); S.I. 2004/641, art. 4 (with Sch. 3 para. 7)
F8Words in s. 106(6) substituted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 35(8)(a); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt.II
F9Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F10Words in s. 106(6) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 99(5)(c), 105(3); S.I. 2004/641, art. 4 (with Sch. 3 para. 7)
F11S. 106(7) repealed (1.7.1992) and is expressed to cease to have effect (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), ss. 35(8)(b), 56(7), Sch. 2; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, arts. 3, 4, Sch. Pts. I, II
Modifications etc. (not altering text)
C1S. 106 applied (23.8.2007) by The Docklands Light Railway (Capacity Enhancement and 2012 Games Preparation) Order 2007 (S.I. 2007/2297), art. 15(2) (with savings in arts. 3(6), 12(3))
C2S. 106 applied (14.9.2006) by The Borough of Poole (Poole Harbour Opening Bridges) Order 2006 (S.I. 2006/2310), art. 14(2)(4)
C3S. 106 applied (3.7.2006) by The Port of Blyth (Battleship Wharf Railway) Order 2006 (S.I. 2006/1518), art. 10(2)
C4S. 106 applied (25.11.2005) by The Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), art. 19(2)
C5S. 106 applied (7.8.2012) by The Ipswich Barrier Order 2012 (S.I. 2012/1867), arts. 1, 13(2) (with arts. 46-48, Sch. 8 para. 18)
C6S. 106 applied (26.9.2012) by The Network Rail (Ipswich Chord) Order 2012 (S.I. 2012/2284), arts. 1, 13(2) (with art. 26(2))
C7S. 106 applied (6.11.2012) by The Network Rail (North Doncaster Chord) Order 2012 (S.I. 2012/2635), arts. 1, 20(2) (with art. 35(2))
C8S. 106 applied (13.11.2012) by The Chiltern Railways (Bicester to Oxford Improvements) Order 2012 (S.I. 2012/2679), arts. 1, 19(2) (with art. 42(2))
C9S. 106 modified (9.4.2013) by The Lancashire County Council (Torrisholme to the M6 Link (A683 Completion of Heysham to M6 Link Road)) Order 2013 (S.I. 2013/675), arts. 1, 16(2)
C10S. 106 applied (9.4.2013) by The Hinkley Point C (Nuclear Generating Station) Order 2013 (S.I. 2013/648), arts. 1, 21(2) (with arts. 48, 68, 79)
C11S. 106 applied (15.8.2013) by The North Blyth Biomass Power Station Order 2013 (S.I. 2013/1873), arts. 1, 11(2) (with art. 30)
C12S. 106 applied (22.8.2013) by The Leeds Railway Station (Southern Entrance) Order 2013 (S.I. 2013/1933), arts. 1, 13(2)
C13S. 106 applied (6.11.2013) by The Transport for Greater Manchester (Light Rapid Transit System) (Second City Crossing) Order 2013 (S.I. 2013/2587), arts. 1, 20(2) (with arts. 20(7), 42, 43)
C14S. 106 applied (9.1.2014) by The National Grid (King’s Lynn B Power Station Connection) Order 2013 (S.I. 2013/3200), arts. 1, 14(2) (with art. 14(7))
C15S. 106 applied (21.4.2014) by The Network Rail (Norton Bridge Area Improvements) Order 2014 (S.I. 2014/909), arts. 1, 18(2) (with art. 34(2))
C16S. 106 applied (7.5.2014) by The National Grid (North London Reinforcement Project) Order 2014 (S.I. 2014/1052), arts. 1, 17(2)
C17S. 106 applied (7.7.2014) by The East Anglia ONE Offshore Wind Farm Order 2014 (S.I. 2014/1599), arts. 1, 13(2) (with arts. 37, 38, Sch. 9 para. 19)
C18S. 106 applied (24.7.2014) by The Daventry International Rail Freight Interchange Alteration Order 2014 (S.I. 2014/1796), arts. 1, 17(2) (with arts. 17(7), 24(2), Sch. 6 para. 3)
C19S. 106 applied (6.8.2014) by The Rampion Offshore Wind Farm Order 2014 (S.I. 2014/1873), arts. 1, 20(2) (with arts. 12, 13, 20(7), Sch. 12 Pt. 1 para. 19, Sch. 12 Pt. 2 para. 6, Sch. 12 Pt. 3 para. 5, Sch. 12 Pt. 4 para. 4, Sch. 12 Pt. 5 para. 4)
C20S. 106 applied (18.9.2014) by The A556 (Knutsford to Bowdon Improvement) Development Consent Order 2014 (S.I. 2014/2269), arts. 1, 15(2)
C21S. 106 applied (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), arts. 1, 19(2)
C22S. 106 applied (2.10.2014) by The Clocaenog Forest Wind Farm Order 2014 (S.I. 2014/2441), arts. 1, 18(2) (with art. 33)
C23S. 106 applied (2.10.2014) by The North Killingholme (Generating Station) Order 2014 (S.I. 2014/2434), arts. 1, 14(2) (with arts. 6, 13, 14(7), Sch. 8 Pt. 1 para. 6, Sch. 8 Pt. 3 paras. 4(3), 6, 17, Sch. 8 Pt. 5 para. 9)
C24S. 106 applied (21.10.2014) by The Central Bedfordshire Council (Woodside Link Houghton Regis) Development Consent Order 2014 (S.I. 2014/2637), arts. 1, 16(2)
C25S. 106 applied (23.10.2014) by The South Hook Combined Heat and Power Plant Order 2014 (S.I. 2014/2846), arts. 1, 10(2)
C26S. 106 modified (29.10.2014) by The Able Marine Energy Park Development Consent Order 2014 (S.I. 2014/2935), art. 20(2) (with arts. 30(4), 53)
C27S. 106 applied (28.11.2014) by The Walney Extension Offshore Wind Farm Order 2014 (S.I. 2014/2950), arts. 1, 15(2) (with arts. 38, 39)
C28S. 106 applied (15.12.2014) by The London Underground (Northern Line Extension) Order 2014 (S.I. 2014/3102), arts. 1, 16(2) (with Sch. 8 para. 45)
C29S. 106 applied (31.12.2014) by The Hornsea One Offshore Wind Farm Order 2014 (S.I. 2014/3331), arts. 1, 12(2) (with arts. 37, 38)
C30S. 106 applied (7.1.2015) by The Willington C Gas Pipeline Order 2014 (S.I. 2014/3328), arts. 1, 14(2)
C31S. 106 applied (2.2.2015) by The Northumberland County Council (A1 – South East Northumberland Link Road (Morpeth Northern Bypass)) Development Consent Order 2015 (S.I. 2015/23), arts. 1, 18(2) (with art. 18(7))
C32S. 106 applied (25.2.2015) by The A160/A180 (Port of Immingham Improvement) Development Consent Order 2015 (S.I. 2015/129), arts. 1, 16(2)
C33S. 106 applied (11.3.2015) by The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 (S.I. 2015/318), arts. 1, 17(2) (with art. 17(7)(9), 40, 41, Sch. 12 Pt. 1 paras. 4, 9(2), 10, Sch. 12 Pt. 2 paras. 4(2)(3), 19, Sch. 12 Pt. 4 paras. 3, 4, 16
C34S. 106 applied (1.4.2015) by The Knottingley Power Plant Order 2015 (S.I. 2015/680), arts. 1, 15(2) (with art. 15(7), Sch. 8 para. 10)
C35S. 106 applied (21.4.2015) by The Network Rail (Ordsall Chord) Order 2015 (S.I. 2015/780), arts. 1, 17(2) (with arts. 17(2), 36(2))
C36S. 106 applied (9.6.2015) by The White Moss Landfill Order 2015 (S.I. 2015/1317), arts. 1, 9(2) (with art. 5)
C37S. 106 applied (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), arts. 1, 17(2)
C38S. 106 applied (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), arts. 1, 13(2) (with arts. 51, 53)
C39S. 106 applied (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), arts. 1, 15(2) (with art. 44)
C40S. 106 applied (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), arts. 1, 15(2)
C41S. 106 applied (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 14(2)
C42S. 106 applied (26.8.2015) by The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (S.I. 2015/1592), arts. 1, 18(2) (with arts. 40, 41)
C43S. 106 applied (19.11.2015) by The Ferrybridge Multifuel 2 Power Station Order 2015 (S.I. 2015/1832), arts. 1(2), 12(2)
C44S. 106 applied (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), arts. 1, 8(2)
C45S. 106 modified (30.12.2015) by The Port Talbot Steelworks Generating Station Order 2015 (S.I. 2015/1984), arts. 1, 10(2) (with art. 26)
C46S. 106 applied (2.2.2016) by The East Midlands Gateway Rail Freight Interchange and Highway Order 2016 (S.I. 2016/17), arts. 1, 22(2)
C47S. 106 applied (9.2.2016) by The National Grid (Hinkley Point C Connection Project) Order 2016 (S.I. 2016/49), arts. 1, 16(2) (with art. 16(7)(8), 32)
C48S. 106 applied (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), arts. 1, 15(2) (with art. 37)
C49S. 106 applied (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), arts. 1, 17(2) (with art. 39)
C50S. 106 applied (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), arts. 1, 17(2) (with arts. 4, 5(3), 17(6))
C51S. 106 applied (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), arts. 1, 15(2) (with art. 39)
C52S. 106 applied (2.8.2016) by The Meaford Gas Fired Generating Station Order 2016 (S.I. 2016/779), arts. 1, 16(2)
C53S. 106 applied (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), arts. 1, 20(2) (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))
C54S. 106 applied (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), arts. 1, 14(2) (with arts. 14(7), 35, 36)
C55S. 106 applied (19.8.2016) by The North Wales Wind Farms Connection Order 2016 (S.I. 2016/818), arts. 1, 16(2) (with art. 35)
C56S. 106 applied (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), arts. 1(2), 15(2) (with arts. 37, 38)
C57S. 106 applied (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), arts. 1, 18(2) (with art. 43)
C58S. 106 applied (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), arts. 1, 17(2)
C59S. 106 applied (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), arts. 1(2), 12(2) (with arts. 39, 40, Sch. 8 para. 19)
C60S. 106 applied (28.10.2016) by The Brechfa Forest Wind Farm Connection Order 2016 (S.I. 2016/987), arts. 1, 15(2) (with arts. 15(7), 37)
C61S. 106 applied (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), arts. 1, 21(2) (with arts. 21(7), 43, 44)
C62S. 106 applied (18.3.2017) by The North London Heat and Power Generating Station Order 2017 (S.I. 2017/215), arts. 1, 16(6)
C63S. 106 applied (29.3.2017) by The Glyn Rhonwy Pumped Storage Generating Station Order 2017 (S.I. 2017/330), arts. 1, 17(2) (with art. 31)
C64S. 106 applied (5.4.2017) by The Keuper Underground Gas Storage Facility Order 2017 (S.I. 2017/433), arts. 1, 16(2)
C65S. 106 applied (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), arts. 1, 15(2)
C66S. 106 applied (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), arts. 1, 16(2) (with arts. 16(7), 22)
C67S. 106 applied (29.8.2017) by The East Anglia THREE Offshore Wind Farm Order 2017 (S.I. 2017/826), arts. 1, 13(2) (with arts. 5(9), 36, 37, Sch. 8 para. 34)
C68S. 106 applied (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), arts. 1, 14(2) (with art. 14(7), Sch. 8 para. 20)
C69S. 106 applied (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 15(2) (with art. 32(2))
C70S. 106 applied (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 18(2) (with arts. 4, 37)
C71S. 106 applied (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), arts. 1, 19(2) (with arts. 55-57, Sch. 8 para. 13)
C72S. 106 applied (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 19(2) (with arts. 19(7), 58, 59)
C73S. 106 applied (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 14(2) (with arts. 14(7), 24(8), 33(2))
C74S. 106 applied (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 14(2)
C75S. 106 applied (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 16(2) (with arts. 16(7), 31(2))
C76S. 106 applied (3.10.2018) by The A19/A184 Testo’s Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 17(2)(7) (with arts. 3(3), 5)
C77S. 106 applied (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), arts. 1, 14(2) (with arts. 6, 42)
C78S. 106 applied (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 18(2) (with arts. 18(6), 55, 56)
C79S. 106 applied (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 16(2)
C80S. 106 applied (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 16(2)
C81S. 106 applied (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 16(2)
C82S. 106 applied (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), arts. 1, 21(2) (with art. 21(8), Sch. 13 Pt. 1 para. 19)
C83S. 106 applied (25.2.2020) by The Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020 (S.I. 2020/114), arts. 1, 19(2) (with arts. 19(7), 37(2))
C84S. 106 applied (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 20(2) (with art. 3(1))
C85S. 106 applied (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 15(2) (with arts. 7, 15(7))
C86S. 106 applied (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 17(2) (with arts. 5, 17(7), 44)
C87S. 106 applied (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 18(2) (with arts. 7, 18(6))
C88S. 106 applied (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 15(2) (with arts. 15(6), 51, 56)
C89S. 106 applied (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 21(2) (with art. 21(7))
C90S. 106 applied (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 21(2) (with art. 37)
C91S. 106 applied (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 17(2) (with arts. 5, 44)
C92S. 106 applied (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 13(2) (with art. 37)
C93S. 106 applied (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), arts. 1, 15(2) (with arts. 41, 42, Sch. 16 para. 66)
C94S. 106 applied (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 17(2) (with arts. 5, 17(7))
C95S. 106 applied (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 15(2) (with Sch. 9 para. 144)
C96S. 106 applied (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 20(2)
C97S. 106 applied (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 18(2) (with art. 32, Sch. 9 para. 36)
C98S. 106 applied (11.11.2020) by The West Burton C (Gas Fired Generating Station) Order 2020 (S.I. 2020/1148), arts. 1, 11(2) (with reg. 11(7))
C99S. 106 applied (31.12.2020) by The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020 (S.I. 2020/1485), arts. 1, 17(2)
C100S. 106 applied (19.1.2021) by The Network Rail (Suffolk Level Crossing Reduction) Order 2020 (S.I. 2020/1663), arts. 1, 17(2)
C101S. 106 applied (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 15(2) (with arts. 40, 41, Sch. 9 Pt. 5 para. 18)
C102S. 106 applied (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 20(2) (with arts. 5, 20(7), Sch. 27 para. 36)
C103S. 106 applied (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 20(2) (with arts. 4, 47)
C104S. 106 applied (15.3.2021) by The Wheelabrator Kemsley K3 Generating Station Order 2021 (S.I. 2021/173), arts. 1, 10(2)
C105S. 106 applied (2.12.2021) by The South Humber Bank Energy Centre Order 2021 (S.I. 2021/1259), arts. 1, 15(2) (with Sch. 8 para. 48)
C106S. 106 applied (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 12(2) (with arts. 15, 50, Sch. 11 para. 29)
C107S. 106 applied (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 15(2) (with arts. 15(6), 41, 42, Sch. 17 para. 66)
C108S. 106 applied (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 15(2) (with arts. 15(6), 41, 42, Sch. 16)
C109S. 106 applied (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 16(2) (with Sch. 8 Pt. 6 para. 19)
C110S. 106 applied (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 19(4) (with art. 55)
C111S. 106 applied (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 16(2) (with arts. 16(7), 40, 41)
S. 106 applied (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts 1(2), 16(2) (with arts. 16(7), 40, 41)
C112S. 106 applied (27.4.2022) by The Little Crow Solar Park Order 2022 (S.I. 2022/436), arts. 1, 9(2)
C113S. 106 applied (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 17(2)
C114S. 106 applied (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 19(2) (with arts. 6, 19(6), 34)
C115S. 106 applied (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 19(2) (with arts. 5, 19(7), 36)
C116S. 106 applied (30.6.2022) by The Network Rail (Essex and Others Level Crossing Reduction) Order 2022 (S.I. 2022/651), arts. 1, 16(2) (with art. 16(7))
C117S. 106 applied (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 21(2) (with arts. 4, 50)
C118S. 106 applied (1.8.2022) by The Northumberland Line Order 2022 (S.I. 2022/820), arts. 1, 5(2) (with Sch. 10 paras. 21, 43)
C119S. 106 applied (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 25(7) (with arts. 25(9), 62, 76, 87)
C120S. 106 applied (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 20(2) (with arts. 4, 20(6), 53)
C121S. 106 applied (8.9.2022) by The Manston Airport Development Consent Order 2022 (S.I. 2022/922), arts. 1, 16(2) (with arts. 5, 40)
C122S. 106 applied (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 20(2) (with art. 53)
C123S. 106 applied (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 22(2) (with art. 22(7))
C124S. 106 applied (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 21(2) (with arts. 4, 52, Sch. 9 para. 82)
C125S. 106 applied (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 22(2) (with art. 51)
C126S. 106 applied (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 21(2) (with arts. 4, 21(6))
C127S. 106 applied (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 19(2) (with arts. 5, 19(7))
C128S. 106 applied (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 14(2) (with art. 32, Sch. 10 paras. 26(2), 68)
C129S. 106 applied (11.1.2023) by The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (S.I. 2022/1406), arts. 1, 16(2) (with arts. 16(7), 34(2), Sch. 12 paras. 5, 47, 79)
C130S. 106 applied (13.2.2023) by The East Northamptonshire Resource Management Facility Order 2023 (S.I. 2023/110), arts. 1, 11(2) (with art. 9)
C131S. 106 applied (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 21(2) (with arts. 4, 21(6), 50)
C132S. 106 applied (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 15(2) (with art. 15(7))
C133S. 106 applied (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 20(2) (with arts. 5, 20(6), 53, Sch. 8 paras. 6, 64)
C134S. 106 applied (2.8.2023) by The Rother Valley Railway (Bodiam to Robertsbridge Junction) Order 2023 (S.I. 2023/815), arts. 1, 16(2) (with art. 42)
C135S. 106 applied (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 15(2) (with arts. 15(7), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)
C136S. 106 applied (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 13(2) (with arts. 6(2), 13(6), 18, Sch. 11 paras. 5, 30)
C137S. 106 applied (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 20(2) (with arts. 4, 20(9), 45, Sch. 9 paras. 6, 46, 54(1))
C138S. 106 applied (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 14(2) (with arts. 36, 37, Sch. 9 paras. 14, 44(1), 76, 103)
C139S. 106 applied (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 15(2) (with art. 43, Sch. 12 paras. 5, 24)
C140S. 106 applied (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 24(2) (with arts. 4, 24(8), 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)
C141S. 106 applied (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 17(2) (with arts. 42, 43, Sch. 12 paras. 5, 51, 91, 129, 136, 234, 345, 356)
C142S. 106 applied (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 18(2) (with art. 18(6), Sch. 11 paras. 5, 22, 37, 47, 82, 110)
C143S. 106 applied (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 13(2) (with arts. 18, 35, Sch. 9)
C144S. 106 applied (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 19(2) (with arts. 19(7), 44, Sch. 15)
C145S. 106 applied (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 20(2) (with arts. 21, 41, Sch. 10)
C146S. 106 applied (25.4.2024) by The Network Rail (Church Fenton Level Crossing Reduction) Order 2024 (S.I. 2024/526), arts. 1, 16(2) (with arts. 16(7), 39, 40)
C147S. 106 applied (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 14(2) (with arts. 35, 36, Sch. 14)
C148S. 106 applied (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 24(2) (with art. 6, Sch. 10)
C149S. 106 applied (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 15(2) (with art. 45, Sch. 14)
C150S. 106 applied (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 14(2) (with art. 44, Sch. 12)
C151S. 106 applied (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 16(2) (with Sch. 15)
C152S. 106 applied (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 16(2) (with art. 48, Sch. 15)
C153S. 106(8) restricted (18.12.1996) by 1996 c. 61, s. 38, Sch. 10 para. 13
C154S. 106(8) excluded (22.7.2008) by Crossrail Act 2008 (c. 18), s. 40, Sch. 14 para. 16
C155S. 106(8) excluded (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), art. 1, Sch. 19 Pt. 1 para. 5
C156S. 106(8) excluded (23.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(1), Sch. 21 para. 7
Marginal Citations
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: