- Latest available (Revised)
- Point in Time (03/11/2022)
- Original (As enacted)
Version Superseded: 04/11/2022
Point in time view as at 03/11/2022.
Compulsory Purchase (Vesting Declarations) Act 1981, Introductory Text is up to date with all changes known to be in force on or before 25 December 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations.
Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.
An Act to consolidate the provisions of the Town and Country Planning Act 1968 concerning general vesting declarations, and related enactments.
[30th October 1981]
Modifications etc. (not altering text)
C1Act applied (16.3.1992) by Avon Weir Act 1992 (c. v), s. 4(3)
C2Act applied (with modifications) (7.3.1995) by S.I 1995/519, art. 22(3)
Act applied (with modifications) (18.12.1996) by 1996 c. 61, ss. 4(3), 6, Sch. 4 Pt. II paras. 4, 5, 14(5), 15, Sch. 5 para. 3(b)
Act applied (with modifications) (18.12.1996) by 1996 c. 61, s. 45(5)(6), Sch. 4 para. 5(2)-(7)
Act applied (with modifications) (27.8.1998) by S.I. 1998/1936, art. 28
Act applied (with modifications) (13.1.1999) by S.I. 1998/3269, art. 22(1)(2)
Act applied (with modifications) (19.2.1999) by S.I. 1999/537, arts. 6(3)(4), 7(2), 11
Act applied (with modifications) (23.8.1999) by S.I. 1999/2981, art. 19
Act applied (with modifications) (24.12.1999) by S.I. 2000/428, art. 12
Act applied (with modifications) (29.3.2001) by S.I. 2001/1347, arts. 24, 33(1)(2)
Act applied (with modifications) (29.3.2001) by S.I. 2001/1348, art. 5
Act applied (with modifications) (2.3.2001) by S.I. 2001/1367, art. 8
Act applied (with modifications) (2.3.2001) by S.I. 2001/1369, art. 5
Act applied (with modifications) (22.3.2001) by S.I. 2001/1451, arts. 9(3)(4), 13(b)
Act applied (with modifications) (24.7.2001) by S.I. 2001/3627, art. 37
Act applied (with modifications) (9.11.2001) by S.I. 2001/3682, art. 20
Act applied (with modifications) (14.3.2002) by The Chester Guided Busway Order 2002 (S.I. 2002/412), arts. 16, 23 (with saving in art. 38)
Act applied (with modifications) (30.4.2002) by The Docklands Light Railway (Silvertown and London City Airport Extension) Order 2002 (S.I. 2002/1066), arts. 22, 32 (with art. 26, Sch. 8)
Act applied (with modifications) (31.5.2002) by The Greater Manchester (Light Rapid Transit System) (Trafford Depot) Order 2002 (S.I. 2002/1327), art. 20
Act applied (with modifications) (12.8.2002) by The Channel Tunnel Rail Link (Thames Tunnel Approach) Order 2002 (S.I. 2002/1943), arts. 4(3)(4), 10
C3Act: transfer of functions (1.7.1999) by S.I. 1999/672, art. 2, Sch. 1
C4Act modified (25.11.1998 for specified purposes and otherwise 3.7.2000) by 1998 c. 45, s. 19(6), Sch. 4 paras. 6-9 ; S.I. 1998/2952, art. 2(2); S.I. 2000/1173, art. 2(2)(c)
C5Act applied (with modifications) (2.4.2004) by The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), arts. 25, 37
C6Act applied (with modifications) (11.2.2005) by The Merseytram (Liverpool City Centre to Kirkby) Order 2005 (S.I. 2005/120), arts. 31, 41 (with arts. 65, 66)
C7Act applied (with modifications) (22.3.2005) by The Midland Metro (Wednesbury to Brierley Hill and Miscellaneous Amendments) Order 2005 (S.I. 2005/927), art. 31 (with art. 51)
C8Act applied (with modifications) (22.7.2005) by The Midland Metro (Birmingham City Centre Extension, etc.) Order 2005 (S.I. 2005/1794), art. 27 (with art. 47)
C9Act applied (with modifications) (26.8.2005) by The River Tyne (Tunnels) Order 2005 (S.I. 2005/2222), art. 26 (with arts. 45(1), 48, Sch. 10 paras. 21, 29)
C10Act applied (with modifications) (25.11.2005) by The Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), arts. 26, 36 (with arts. 3(5), 15(3))
C11Act applied (with modifications) (11.1.2006) by The Cambridgeshire Guided Busway Order 2005 (S.I. 2005/3523), arts. 24, 33 (with art. 52)
C12Act applied (with modifications) (14.9.2006) by The Borough of Poole (Poole Harbour Opening Bridges) Order 2006 (S.I. 2006/2310), art. 20 (with art. 40, Sch. 7 para. 12)
C13Act applied (with modifications) (22.11.2006) by The Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), arts. 22, 33 (with art. 43)
C14Act applied (with modifications) (13.12.2006) by The Luton Dunstable Translink Order 2006 (S.I. 2006/3118), arts. 21, 28
C15Act applied (with modifications) (19.3.2007) by The Ouseburn Barrage Order 2007 (S.I. 2007/608), arts. 25, 32 (with arts. 46-48, Sch. 6 para. 23)
C16Act applied (with modifications) (23.8.2007) by The Docklands Light Railway (Capacity Enhancement and 2012 Games Preparation) Order 2007 (S.I. 2007/2297), arts. 22, 31 (with arts. 3(6), 12(3))
C17Act applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 6 paras. 4, 5
C18Act applied (with modifications) (14.10.2008) by The Felixstowe Branch Line and Ipswich Yard Improvement Order 2008 (S.I. 2008/2512), arts. 24, 33(1) (with art. 36(3))
C19Act applied (with modifications) (29.12.2008) by The Network Rail (Thameslink) (Land Acquisition) Order 2008 (S.I. 2008/3163), art. 5 (with art. 13)
C20Act applied (with modifications) (9.6.2009) by The Nottingham Express Transit System Order 2009 (S.I. 2009/1300), art. 31 (with art. 45(1), Sch. 13 para. 14(2), Sch. 14 para. 19)
C21Act applied (with modifications) (18.9.2009) by The London Underground (Victoria Station Upgrade) Order 2009 (S.I. 2009/2364), arts. 19, 30
C22Act applied (with modifications) (28.10.2009) by The Network Rail (Reading) (Land Acquisition) Order 2009 (S.I. 2009/2728), arts. 5, 17
C23Act applied (with modifications) (20.7.2010) by The Network Rail (Nuneaton North Chord) Order 2010 (S.I. 2010/1721), arts. 18, 25
C24Act applied (with modifications) (1.2.2011) by The River Mersey (Mersey Gateway Bridge) Order 2011 (S.I. 2011/41), arts. 23, 34 (with art. 51, Sch. 10 paras. 68, 85)
C25Act applied (with modifications) (21.4.2011) by The Network Rail (Hitchin (Cambridge Junction)) Order 2011 (S.I. 2011/1072), arts. 19, 31
C26Act applied (with modifications) (1.7.2011) by The Saundersfoot Harbour Empowerment Order 2011 (S.I. 2011/1565), art. 18
C27Act applied (with modifications) (7.8.2012) by The Ipswich Barrier Order 2012 (S.I. 2012/1867), arts. 23, 33 (with arts. 46-48, Sch. 8 para. 18)
C28Act applied (with modifications) (26.9.2012) by The Network Rail (Ipswich Chord) Order 2012 (S.I. 2012/2284), art. 20 (with art. 26(2))
C29Act applied (with modifications) (6.11.2012) by The Network Rail (North Doncaster Chord) Order 2012 (S.I. 2012/2635), art. 26 (with art. 35(2))
C30Act applied (with modifications) (13.11.2012) by The Chiltern Railways (Bicester to Oxford Improvements) Order 2012 (S.I. 2012/2679), arts. 24, 36 (with art. 42(2))
C31Act applied (with modifications) (28.3.2013) by The Network Rail (Seaham Level Crossing) Order 2013 (S.I. 2013/533), arts. 7, 13
C32Act applied (with modifications) (9.4.2013) by The Lancashire County Council (Torrisholme to the M6 Link (A683 Completion of Heysham to M6 Link Road)) Order 2013 (S.I. 2013/675), art. 24
C33Act applied (with modifications) (9.4.2013) by The Hinkley Point C (Nuclear Generating Station) Order 2013 (S.I. 2013/648), art. 29 (with arts. 48, 68, 79)
C34Act applied (with modifications) (16.4.2013) by The Network Rail (Pont Briwet) (Land Acquisition) Order 2013 (S.I. 2013/767), art. 5 (with arts. 20, 21)
C35Act applied (with modifications) (15.6.2013) by The Galloper Wind Farm Order 2013 (S.I. 2013/1203), art. 20 (with arts. 11, 12)
C36Act applied (with modifications) (21.8.2013) by The Croxley Rail Link Order 2013 (S.I. 2013/1967), art. 18
C37Act applied (with modifications) (22.8.2013) by The Leeds Railway Station (Southern Entrance) Order 2013 (S.I. 2013/1933), arts. 23, 33
C38Act applied (with modifications) (6.11.2013) by The Transport for Greater Manchester (Light Rapid Transit System) (Second City Crossing) Order 2013 (S.I. 2013/2587), art. 28 (with arts. 38(1), 42, 43)
C39Act applied (with modifications) (20.11.2013) by The M1 Junction 10a (Grade Separation) Order 2013 (S.I. 2013/2808), art. 22
C40Act applied (with modifications) (21.11.2013) by The Network Rail (Redditch Branch Enhancement) Order 2013 (S.I. 2013/2809), art. 19 (with arts. 16(1), 27(2), 39, Sch. 10 para. 4)
C41Act applied (with modifications) (9.1.2014) by The National Grid (King’s Lynn B Power Station Connection) Order 2013 (S.I. 2013/3200), art. 21 (with art. 20(1))
C42Act applied (with modifications) (9.1.2014) by The Ashton Vale to Temple Meads and Bristol City Centre Rapid Transit Order 2013 (S.I. 2013/3244), arts. 25, 35 (with arts. 57, 58, Sch. 11 para. 19)
C43Act applied (with modifications) (11.3.2014) by The Crossrail (Paddington Station Bakerloo Line Connection) Order 2014 (S.I. 2014/310), arts. 10, 17
C44Act applied (with modifications) (21.4.2014) by The Network Rail (Norton Bridge Area Improvements) Order 2014 (S.I. 2014/909), art. 24 (with art. 34(2))
C45Act applied (with modifications) (7.5.2014) by The National Grid (North London Reinforcement Project) Order 2014 (S.I. 2014/1052), art. 27
C46Act applied (with modifications) (7.7.2014) by The East Anglia ONE Offshore Wind Farm Order 2014 (S.I. 2014/1599), art. 19 (with arts. 37, 38, Sch. 9 para. 19)
C47Act applied (with modifications) (24.7.2014) by The Daventry International Rail Freight Interchange Alteration Order 2014 (S.I. 2014/1796), art. 21 (with art. 24(2), Sch. 6 para. 3)
C48Act applied (with modifications) (29.7.2014) by The Felixstowe Branch Line (Land Acquisition) Order 2014 (S.I. 2014/1821), arts. 5, 14
C49Act applied (with modifications) (6.8.2014) by The Rampion Offshore Wind Farm Order 2014 (S.I. 2014/1873), art. 27 (with arts. 12, 13, Sch. 12 Pt. 1 para. 19, Pt. 2 para. 6, Pt. 3 para. 5, Pt. 4 para. 4, Pt. 5 para. 4)
C50Act applied (with modifications) (19.8.2014) by The Network Rail (Huyton) Order 2014 (S.I. 2014/2027), art. 18 (with art. 31(2))
C51Act applied (with modifications) (18.9.2014) by The A556 (Knutsford to Bowdon Improvement) Development Consent Order 2014 (S.I. 2014/2269), arts. 19, 22
Act applied (with modifications) (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), arts. 1, 34
C52Act applied (with modifications) (2.10.2014) by The North Killingholme (Generating Station) Order 2014 (S.I. 2014/2434), arts. 19(1)(b), 21 (with arts. 6, 13, 16(4), Sch. 8 Pt. 1 para. 6, Sch. 8 Pt. 3 paras. 4(3), 6, 17, Sch. 8 Pt. 5 para. 9)
C53Act applied (2.10.2014) by The Clocaenog Forest Wind Farm Order 2014 (S.I. 2014/2441), art. 25 (with art. 33)
C54Act applied (with modifications) (21.10.2014) by The Central Bedfordshire Council (Woodside Link Houghton Regis) Development Consent Order 2014 (S.I. 2014/2637), art. 23
C55Act applied (with modifications) (29.10.2014) by The Able Marine Energy Park Development Consent Order 2014 (S.I. 2014/2935), art. 36 (with arts. 30(4), 53)
C56Act applied (with modifications) (28.11.2014) by The Walney Extension Offshore Wind Farm Order 2014 (S.I. 2014/2950), art. 23 (with arts. 38, 39)
C57Act applied (with modifications) (15.12.2014) by The London Underground (Northern Line Extension) Order 2014 (S.I. 2014/3102), art. 25 (with Sch. 8 para. 45)
C58Act applied (with modifications) (31.12.2014) by The Hornsea One Offshore Wind Farm Order 2014 (S.I. 2014/3331), art. 19 (with arts. 37, 38)
C59Act applied (with modifications) (7.1.2015) by The Willington C Gas Pipeline Order 2014 (S.I. 2014/3328), art. 21
C60Act applied (with modifications) (2.2.2015) by The Northumberland County Council (A1 – South East Northumberland Link Road (Morpeth Northern Bypass)) Development Consent Order 2015 (S.I. 2015/23), art. 25
C61Act applied (with modifications) (25.2.2015) by The A160/A180 (Port of Immingham Improvement) Development Consent Order 2015 (S.I. 2015/129), art. 24
C62Act applied (with modifications) (26.2.2015) by The Cornwall Council (A30 Temple to Higher Carblake Improvement) Order 2015 (S.I. 2015/147), art. 24
C63Act applied (with modifications) (11.3.2015) by The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 (S.I. 2015/318), art. 26 (with arts. 40, 41, Sch. 12 Pt. 1 paras. 4, 9(2), 10, Sch. 12 Pt. 2 paras. 4(2)(3), 19, Sch. 12 Pt. 4 paras. 3, 4, 16)
C64Act applied (with modifications) (1.4.2015) by The Knottingley Power Plant Order 2015 (S.I. 2015/680), art. 23 (with Sch. 8 para. 10)
C65Act applied (with modifications) (21.4.2015) by The Network Rail (Ordsall Chord) Order 2015 (S.I. 2015/780), art. 23 (with art. 36(2))
C66Act applied (with modifications) (21.4.2015) by The Crossrail (Plumstead Sidings) Order 2015 (S.I. 2015/781), art. 10(2)
C67Act applied (with modifications) (9.6.2015) by The White Moss Landfill Order 2015 (S.I. 2015/1317), art. 17 (with art. 5)
C68Act applied (with modifications) (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), art. 25
C69Act applied (with modifications) (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), art. 29 (with arts. 51, 53)
C70Act applied (with modifications) (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), art. 22 (with art. 44)
C71Act applied (with modifications) (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), art. 22 (with art. 30)
C72Act applied (with modifications) (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), art. 23
C73Act applied (with modifications) (26.8.2015) by The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (S.I. 2015/1592), art. 27 (with arts. 40, 41)
C74Act applied (with modifications) (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), art. 5(2)
C75Act applied (with modifications) (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), art. 15 (with art. 24(1)(b))
C76Act applied (with modifications) (30.12.2015) by The Port Talbot Steelworks Generating Station Order 2015 (S.I. 2015/1984), art. 13 (with art. 26)
C77Act applied (with modifications) (12.1.2016) by The London Underground (Bank Station Capacity Upgrade) Order 2015 (S.I. 2015/2044), art. 22
C78Act applied (with modifications) (2.2.2016) by The East Midlands Gateway Rail Freight Interchange and Highway Order 2016 (S.I. 2016/17), art. 29
C79Act applied (with modifications) (9.2.2016) by The National Grid (Hinkley Point C Connection Project) Order 2016 (S.I. 2016/49), art. 25 (with arts. 21(1), 32)
C80Act applied (with modifications) (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), art. 23 (with art. 37)
C81Act applied (with modifications) (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), art. 25 (with art. 39)
C82Act applied (with modifications) (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), art. 26 (with arts. 4, 5(3))
C83Act applied (with modifications) (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), art. 22 (with art. 39)
C84Act applied (with modifications) (2.8.2016) by The Meaford Gas Fired Generating Station Order 2016 (S.I. 2016/779), art. 19
C85Act applied (with modifications) (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), art. 29 (with arts. 39, 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))
C86Act applied (with modifications) (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), art. 28 (with arts. 35, 36)
C87Act applied (with modifications) (19.8.2016) by The North Wales Wind Farms Connection Order 2016 (S.I. 2016/818), art. 24 (with art. 35)
C88Act applied (with modifications) (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), art. 22 (with arts. 37, 38)
C89Act applied (with modifications) (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), art. 26 (with art. 43)
C90Act applied (with modifications) (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), art. 24
C91Act applied (with modifications) (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), art. 20 (with arts. 39, 40, Sch. 8 para. 19)
C92Act applied (with modifications) (28.10.2016) by The Brechfa Forest Wind Farm Connection Order 2016 (S.I. 2016/987), arts. 22, 25 (with art. 37)
C93Act applied (with modifications) (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), art. 29 (with arts. 43, 44)
C94Act applied (with modifications) (23.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 4(4), Sch. 6 para. 3, Sch. 9 paras. 3, 4 (as amended (24.2.2017) by 2017 (c. 7), s. 70(2), Sch. 14 paras. 6, 7, 9; S.I. 2017/209, reg. 2)
C95Act applied (with modifications) (18.3.2017) by The North London Heat and Power Generating Station Order 2017 (S.I. 2017/215), art. 23
C96Act applied (with modifications) (5.4.2017) by The Keuper Underground Gas Storage Facility Order 2017 (S.I. 2017/433), art. 26
C97Act applied (with modifications) (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), art. 19
C98Act applied (with modifications) (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), art. 25 (with art. 22)
C99Act applied (29.8.2017) by The East Anglia THREE Offshore Wind Farm Order 2017 (S.I. 2017/826), art. 19 (with arts. 36, 37, Sch. 8 para. 34)
C100Act applied (with modifications) (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), art. 23 (with Sch. 8 para. 20)
C101Act applied (with modifications) (8.12.2017) by The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017 (S.I. 2017/1074), Sch. 1 paras. 4, 5
C102Act applied (with modifications) (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), art. 20 (with arts. 28(1)(b), 32(2))
C103Act applied (with modifications) (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), art. 28 (with arts. 4, 23, 37)
C104Act applied (with modifcations) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), art. 33 (with arts. 43(1), 55-57, Sch. 8 para. 13)
C105Act applied (with modifications) (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), art. 28 (with arts. 58, 59)
C106Act applied (with modifications) (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 19, 29 (with arts. 24(8), 33(2))
C107Act applied (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 21, 26
C108Act applied (with modifications) (4.6.2018) by The Network Rail (Kings Mill No. 1 Level Crossing) (Land Acquisition and Closure) Order 2018 (S.I. 2018/571), arts. 7, 14
C109Act applied (with modifications) (28.6.2018) by The High Speed Rail (London West Midlands) (Greatmoor Railway Sidings Etc.) Order 2018 (S.I. 2018/693), arts. 9, 15
C110Act applied (with modifications) (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 20(1), 28(1)(b) (with art. 31(2))
C111Act applied (with modifications) (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), arts. 12, 18(1)(b)
C112Act applied (with modifications) (3.10.2018) by The A19/A184 Testos Junction Alteration Development Consent Order 2018 (S.I. 2018/994), art. 26 (with arts. 3(3), 5, 22)
C113Act applied (with modifications) (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), art. 22(10) (with art. 6)
C114Act applied (with modifications) (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 31 (with arts. 55, 56)
C115Act applied (with modifications) (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 23
C116Act applied (with modifications) (7.5.2019) by The Midland Metro (Birmingham City Centre Extension, etc.) (Edgbaston Extension Land Acquisition) Order 2019 (S.I. 2019/882), art. 6 (with arts. 12(1), 18)
C117Act applied (with modifications) (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 24
C118Act applied (with modifications) (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 24
C119Act applied (with modifications) (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), art. 31 (with Sch. 13 Pt. 1 para. 19)
C120Act applied (with modifications) (25.2.2020) by The Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020 (S.I. 2020/114), arts. 1, 24 (with art. 37(2))
C121Act applied (with modifications) (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1(1), 30 (with art. 3(1))
C122Act applied (with modifications) (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), art. 30 (with arts. 47, 48, Sch. 10 para. 19)
C123Act applied (with modifications) (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), art. 22 (with art. 7)
C124Act applied (with modifications) (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), art. 26 (with arts. 5, 22, 44)
C125Act applied (with modifications) (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 28 (with art. 7)
C126Act applied (with modifications) (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 31 (with arts. 51, 57)
C127Act applied (with modifications) (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 31
C128Act applied (with modifications) (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 30 (with art. 37)
C129Act applied (with modifications) (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 26 (with arts. 5, 44)
C130Act applied (with modifications) (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 20 (with art. 37)
C131Act applied (with modifications) (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), arts. 1, 22 (with arts. 41, 42, Sch. 16 para. 66)
C132Act applied (with modifications) (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), art. 26 (with art. 5)
C133Act applied (with modifications) (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), art. 23 (with Sch. 9 para. 144)
C134Act applied (with modifications) (23.9.2020) by The Midland Metro (Wednesbury to Brierley Hill Land Acquisition) Order 2020 (S.I. 2020/1067), art. 5 (with art. 11(1)(b))
C135Act applied (with modifications) (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), art. 32
C136Act applied (with modifications) (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), art. 27 (with arts. 24(1)(b), 32, Sch. 9 para. 36)
C137Act applied (with modifications) (2.12.2020) by The Network Rail (London to Corby) (Land Acquisition) Order 2020 (S.I. 2020/1259), arts. 1(1), 6 (with art. 16(1))
C138Act applied (with modifications) (31.12.2020) by The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020 (S.I. 2020/1485), arts. 1, 21, 29
C139Act applied (with modifications) (19.1.2021) by The Network Rail (Suffolk Level Crossing Reduction) Order 2020 (S.I. 2020/1663), arts. 1, 20
C140Act applied (with modifications) (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 22 (with arts. 40, 41, Sch. 9 Pt. 5 para. 18)
C141Act applied (with modifications) (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 29 (with art. 5, Sch. 27 para. 36)
C142Act applied (with modifications) (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), s. 64(1), Sch. 9 paras. 3, 4 (with s. 9(1)(b))
C143Act applied (with modifications) (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), s. 64(1), Sch. 7 para. 3 (with s. 9(1)(b))
C144Act applied (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 4(4), 64(1) (with s. 9(1)(b))
C145Act applied (with modifications) (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 30 (with arts. 4, 47)
C146Act applied (with modifications) (1.4.2021) by The Network Rail (Ferryboat Lane Footbridge Reconstruction) (Land Acquisition) Order 2021 (S.I. 2021/299), arts. 1, 5 (with art. 11)
C147Act applied (with modifications) (16.4.2021) by The Network Rail (Chart Leacon) Order 2021 (S.I. 2021/419), arts. 1, 5 (with art. 12(1)(b))
C148Act applied (with modifications) (1.9.2021) by The Network Rail (Teddington Station Access for All) Order 2021 (S.I. 2021/937), arts. 1, 7
C149Act applied (with modifications) (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 25 (with arts. 15, 50, Sch. 11 para. 29)
C150Act applied (with modifications) (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), art. 1, Sch. 7 paras. 6, 7 (with arts. 15, 50, Sch. 11 para. 29)
C151Act applied (with modifications) (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 22 (with arts. 41, 42, Sch. 17 para. 66)
C152Act applied (with modifications) (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 22 (with arts. 41, 42, Sch. 16)
C153Act applied (with modifications) (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 24 (with Sch. 8 Pt. 6 para. 19)
C154Act applied (with modifications) (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 34 (with art. 55)
C155Act applied with modificatiions (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 22 (with arts. 40, 41)
C156Act applied (with modifications) (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 22 (with arts. 40, 41)
C157Act applied (with modifications) (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 26
C158Act applied (with modifications) (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 29 (with arts. 6, 34)
C159Act applied (with modifications) (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 31 (with arts. 5, 27, 36)
C160Act applied (with modifications) (30.6.2022) by The Network Rail (Essex and Others Level Crossing Reduction) Order 2022 (S.I. 2022/651), arts. 1, 19
C161Act applied (with modifications) (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 31 (with arts. 4, 50)
C162Act applied (with modifications) (1.8.2022) by The Northumberland Line Order 2022 (S.I. 2022/820), arts. 1, 16 (with Sch. 10 paras. 21, 43)
C163Act applied (with modifications) (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) (No. 2) Order 2022 (S.I. 2022/872), arts. 1(1), 5
C164Act applied (with modifications) (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) Order 2022 (S.I. 2022/871), arts. 1, 5
C165Act applied (with modifications) (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 34 (with arts. 62, 76, 87)
C166Act applied (with modifications) (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 30 (with arts. 4, 53)
C167Act applied (with modifications) (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 34
C168Act applied (with modifications) (8.9.2022) by The Manston Airport Development Consent Order 2022 (S.I. 2022/922), arts. 1, 26 (with arts. 5, 40)
C169Act applied (with modifications) (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 28 (with arts. 40, 46(2), Sch. 19 para. 61)
Commencement Information
I1Act wholly in force at 30.1.1982, see s. 17(2)
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: